
Siteplan Planning
The starting point: understanding the land, boundaries, access, and space requirements before the working drawings are locked.
Scope of work.
The work typically included in this scope.
Output: Layout & circulation
- 01Read site conditions and boundaries
- 02Organise access and circulation
- 03Set building positions
- 04Align space requirements
Scope overview
Planning starts by reading the site boundaries, access, contours, and building orientation. From there, a layout separates the building footprint, vehicle circulation, and open space.
The result becomes the basis for working drawings: building position, access width, and the relationship between areas. If the site already has buildings, the layout is adjusted to existing conditions.



How it works.
01
Measure the land
02
Draft the layout
03
Lock the working drawings
Other services
Need this scope for your project?
Share the location, dimensions, and target date; the team will check whether the scope fits.